Client: ICS
Asbestos Services were appointed by ICS Cleaning Supplies to carry out removal of high risk asbestos insulation board from internal office areas, prior to major refurbishment to the first floor level.
                         
                       
                       
After initial consultation with  the client, an asbestos R&D survey had been carried out on the building and  an action plan drafted to remove all acoustic ceiling tiles under fully  controlled conditions.
                         
ASB5 notification process was generated for the HSE and  removal works were programmed to start in January to be completed within a  seven day period.
A live working enclosure was constructed to first floor  level, with three stage airlocks constructed as a tunnel within the stairwell  area. Temporary scaffold was used to access the high level asbestos safely,  where the AS team used controlled wetting techniques throughout.
Once again this contract was carried out on time, within  budget and with minimal disruption caused to the ongoing daily operations  of the client.
Dave Coleman, Managing Director of Asbestos Services UK  said: “All works were completed within a live working environment  as business continued as usual on the ground floor. All removal works were  completed in the given timeframes using the necessary high risk approach.”